Happy Anniversary House
We've had the house 1 year today. Sometimes it feels like we haven't really done that much...but when we stop and think we've not done too bad in 12 months:
- Ripped out the old bathroom and airing cupboard
- Ripped out the old fitted wardrobes
- Ripped out the upstairs toilet
- Knocked the 3rd bedroom into the old toilet space
- New boiler and pipework installed in loft
- New central heating system installed
- Electrics rewired and new fuse board
- New double glazing throughout (just about, 10 so far)
- Master bedroom wall crack fixed
- Master bedroom skimmed, coved, painted and wallpapered
- Second bedroom skimmed and painted
- Bathroom boarded and skimmed
- Bathroom painted and floor fixed and laid
- New bathroom suite installed
- Shower tiled
- Kitchen knocked back
- New kitchen on order
- Fireplace restored
- Oh, and a garden that refused to stop growing during the summer!
Not so bad, and there was probably more...we try not to think of the costs :o)
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home