Sunday 2 November 2008

Three Strippers

Well it's the 2nd weekend of work on the house. Jac's dad Norm' came along with his steamer and him and Jac both got a start on the upstairs of the house. I spent most of Saturday working on the front bedroom, knocking back more of the loose plaster around the crack and ridding the ceiling of its polystyrene tiles - which incidentally were glued and pinned in place, meaning after the tiles came down I had about 300 pins to remove by hand :o(

Some of Norm's handy work

Some of Chris's handy work

Some of Jac's handy work

This weekend we also had 'Phil The Builder' come round and look at the crack in the wall in the front bedroom/bathroom. He has given it a "yeah, it's no problem" so good news there. He's going to do a bit of work replacing some bricks and interlocking them again to re-strengthen it before it can be plastered over the top and forgotten about.

All in all a good weekend. Pretty much the whole upstairs stripped and the big worry over the wall relieved a little.

Labels: , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home